Project: Greg's_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Greg Kochersperger   -  
Project:   Vans - RV-10
Total Hours:1320.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Mar 30, 2024     Panel progress - (8.0 hours)       Category: Avionics
Got the harness put back in the sub panel and started worked out the final bus locations. Really didn't like that the GEA was behind the subpanel before so rearranged things a bit and got it forward of the subpanel. Finalized the fuse holes locations and primary bus power routing. Just a lot of staring at it and moving things around. I think I finally got it.

Started drilling some holes in the subpanel for LRU locations. Going to need to reroute some of the wiring but thankfully I ran everything quite a bit long. Should be able to salvage wires, but at some point I will probably rerun all the wires to try to get them pretty.

3/31: just a lot more tinkering. Running one wire at a time at this point. Finalizing LRU locations.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.